Groundwork Outdoor Living
Demolition
Chapter 1 — Demo & Excavation
Area Subtotal
$0
Surface Areas to RemoveBy Material
Rebar removal is included in the concrete rate.
Incl. rebar
Excavation & HaulingPer CY
1.25 standard
Quantities
Pricing
Measurements
Base Configuration
Quantities
Pricing
Measurements
Base Configuration
Quantities
Pricing
Measurements
Base Configuration
Quantities
Pricing
Measurements
Base Configuration
Quantities
Pricing
Step Configuration
Quantities
Pricing
Block Wall
Quantities
Pricing
Concrete Slab
Quantities
Pricing
Turf Measurements
Quantities
Pricing
Putting Green15% waste default
Quantities
Pricing
Natural SodDrives Irrigation
Quantities
Pricing
Plant QuantitiesBy Container
Quantities
Pricing
Mulch & Decorative Rock
Quantities
Pricing
Spray Head TypeAuto-sized from Sod SF
Head count auto-calculated from the Sod area with 50% head-to-head overlap factored in.
Standard: 6
Drip & Extras
Plant beds — manual
Quantities
Pricing
Outdoor Lighting
Quantities
Pricing
Outdoor Audio
Quantities
Pricing
Pergola
Quantities
Pricing
Outdoor Kitchen
Quantities
Pricing
Fire Feature
Quantities
Pricing
Sports Court
Quantities
Pricing
Fencing
Quantities
Pricing
Design & Permitting
Site Facilities
Port-a-potty is always 1 unit. Enter 0 months if not needed.
1 unit, min 1 month
Cleanup & PM
Summary
Pricing
Ready — add areas, fill in scopes, then push each area to JobTread